|
The Velocity, ready to be stripped down to bare bones.
|
Installing the rocket thrust structure that would also serve as the mounting for all the rocket related plumbing and hardware.
|
|
|
|
|
Chief engineer Dan DeLong contemplates the first engine prototype.
|
The engine at the end of the thrust structure, shown with the XCOR bi-propellant fuel valve held in place.
|
Dan and the engine.
|